Budget Test Two Film Budget App on Server

Project

Financial parameters

The allocator computes line items bottom-up from current MEAA rates × headcount × duration. The target reconciles non-MEAA lines (equipment, locations, post, indirect) to fit. If the target is below the MEAA floor (real cast + crew minimums), you'll see a warning and the final budget will exceed the target.

Schedule

Screenplay

QAPE / Producer Offset profile

Used to classify line items into QAPE / non-QAPE buckets on the QAPE worksheet. Defaults assume a fully Australian production.

Processing typically takes 30–90 seconds. Crew and cast lines are costed at current MEAA/MPPCA/AFFCA rates with HOD market multipliers. Super is applied at 12% (crew) and 11% (performers, cap $240k). All template formulas preserved.

Scroll to Top